budget part 2

will revise as required their previous submission based on instructor feedback, and then add the following two sections. This submission will include all four sections.

      Design the Project Schedule. (Add to the base Project software document).

      A key addition to the WBS

      Generate the Budget. (Add to the base Project software document).

You can leave a response, or trackback from your own site.

Leave a Reply

Powered by WordPress | Designed by: Premium WordPress Themes | Thanks to Themes Gallery, Bromoney and Wordpress Themes